July 2015 Vol.2

Download PDF

1. PIPA Updates POP004A for Materials for Electrofusion Welds
http://www.pipa.com.au/sites/default/files/document/attachment/pop004a-2015-7-14.pdf

2. Qenos has now manufactured more than 70,000 tonnes high-performance PE100 pipe resin Alkadyne® HDF145B
http://www.businesswire.com/news/home/20150717005367/en/Qenos’-Alkadyne®-PE100-Pipe-Resin-Produced-Univation#.Vawq6-tK78s

3. Iplex upside given Qld CSG projects ongoing drilling and pipe needs – UBS has a “buy’ recommendation on Fletcher Building (FBU)
http://www.afr.com/markets/equity-markets/broker-watch-fletcher-building-iag-bt-investment-management-csr-20150628-ghy6us

4. Confirmed Speakers for No Dig Pipe Expo on Gold Coast
http://www.nodigdownunder.com.au/events/no-dig-down-under-2015-gold-coast/speakers-b02dbd3f6cca4b01a0d920df47d4db66.aspx

5. *NEW*  Large ISO Wipes for Polyethylene Pipe Welding
(Very low water content < 1% ensures void-free welds)

The success of your HDPE pipe welding depends on removal of contaminants from the weld zone
http://www.polywipes.com
To order contact [email protected]

6. ExoDrill currently expanding their QLD sector, predominantly at Roma and Toowoomba locations
http://www.seek.com.au/job/29001028

7.  Map of New Gas Pipeline Projects
http://www.aemo.com.au/~/media/Files/Gas/Planning/Reports/GSOO/2015/2015%20Gas%20Statement%20of%20Opportunities%20Map%20for%20Eastern%20and%20South%20Eastern%20Australia.ashx

8. New Santos GLNG Gas Field Development Project – Wells and Pipelines
http://www.statedevelopment.qld.gov.au/assessments-and-approvals/santos-glng-gas-field-development-project.html

9. Easternwell brings new CSG drilling rig to the Surat Basin
http://ppo.com.au/news/new_snubbing_tech_for_the_surat/93928

10. Fusion Hire Service Opens Online Store for Poly Pipe Welding
http://www.fhs.com.au/News-Events/News-Blog/Post/3450/FHS-now-on-GOpoly-net-Buy-all-our-products-online

11. Get Your HDPE Pipe Products or Services Noticed – Advertise in Poly Pipe News (PPN) Australia
http://polypipenews.com.au/

12. ExcelPlas Poly Pipe Weld Inspection Top 7 Causes of Weld Failure:
• Lack of scraping
• Inaccurate scraping
• Contamination from dirt, water, oil or clays
• Lack of Paralell-ness of fusion faces
• Misalignment of surfaces
• Time, temperature and pressure deviations
• Not adhering to cool times
We have extensive experience in inspection of poly pipe welds for assuring welded joint quality.  Direct Poly Pipe Inspection ensures that operators are following the proven welding procedure; this reduces the occurrences of operational errors which lead to defects such as inclusions, lack of fusion (LoF), porosity and misalignment. More information: contact [email protected]

This Newsletter is brought to you by ExcelPlas Labs, Australia’s Largest group of Poly Pipe Testing Labs.

Pipe Poly News (PPN) is now Australia’s most current and comprehensive source of news on Polyethylene pipes and Poly Pipe Welding;

Poly Pipe News is now sent to over 2500 Poly Pipe Industry Members every week.

Any news or subscription requests should be sent to [email protected]